US085 M6
On 26 May 1942 a cast-hull T1E2 and a welded-hull T1E3 were standardised for production as the M6 and M6A1 respectively. The initial plan was to produce 5000 tanks at 250 tanks per month, but this was soon cut to a more realistic 115 tanks in the first production run starting in December 1942.
 
 
USD 14.50
 
 Related Products

USD 14.50
USD 13.00
USD 13.00