Purchase these Items

Products mentioned in this Article

--None--
 

 

Airfield Operation MOAB: Part 5
The Race to the Finish


Michael Wong: It’s been a desperate race to the finish line for Richard and me with only two more nights to go till we kick off MOAB 2009. This week has seen plenty of frantic activity, but also the completion of many of our terrain projects. That satisfaction doesn’t last long when there’s still so much to do. Big thanks this week once again to Dean for his continued help, but also to David Robinson and Andrew “The Wargaming Machine” Parr for their considerable help.
I also owe a huge thanks to my wife Nadya not only for helping out with all the terrain making craziness but also for her patience – as you can see from some pictures below I’ve managed to take over our dining room and kitchen for the last week with a mountain of paint, sand, flock, glue and Styrofoam.

The field is firming up with 42 players registered and while we were up for the challenge two months ago for 60 players we’re both glad that there’s nine less tables to worry about! We didn’t have the time to write up a full article this week we’ve been so busy, but we’ve prepared a picture update of all the work to show you all where we are at.

Next week we’ll make another brief update and list the winners of MOAB, as well as have some early pictures of all the finished tables. Our full article on how the tournament went will be the week following next.

Remember that anyone can pop along and visit MOAB, peruse the trader stands and see the tables for themselves this weekend at the Sylvania Heights Community and Youth Club Box Road, Sylvania.  If you’re coming along feel free to find Richard or myself, we’re always happy for a chat.
Operation MOAB Status Report

Richard doing the final construction work on our raised roads (below left and right).
Richard being kept busy Richard preparing raised roads.
Terrain overlays and the airfield drying in the sun (right):
Airfield and overlays drying.
The Airfield ready for action (bottom left and right; below left and right):
Airfield Runway. Airfield Hangers.
Aircraft Pens. Airfield.
The Merville Battery getting all flocked up (below left and right):
Merville Table. Merville Table.
Tree templates being finished (below left and right):
Tree templates under construction. Tree templates ready for flocking.
Putting sand onto the tree bases (below left):
And being finished by Andrew (below right):
Sanding the tree bases. Andrew finishing off the trees.
Hills and terrain overlays being finished (right and below): Hills ready for sanding.
Hills and overlays ready for flocking. Nadya flocking terrain overlays.
Flocked and Drying. Finished hills and overlays.
Only the most patient of wives can put up with this mess! (below left):
And finally a last close up shot of the Airfield table (below right):
Flocked and Drying. Close up of airfield.
Remember to visit the forum thread to get the latest tournament updates for MOAB, and good luck to all the players this weekend.


Last Updated On Friday, October 2, 2009 by Blake at Battlefront